Ketton Cement Works has a long history of development, dating back to the late 19th century. The site was first established in 1896.
The works were built to produce cement, and the facility has undergone several expansions and upgrades since its inception. The original factory was designed to produce around 100 tons of cement per day.
One of the key features of the Ketton Cement Works is its quarrying operation, which provides the raw materials needed for cement production. The quarry is a significant part of the works, covering an area of over 1,000 acres.
The works have also been involved in various environmental initiatives, including the restoration of a nearby nature reserve.
You might enjoy: Chicago International Produce Market
History of the Plant
The history of the Ketton Cement Works is a fascinating story that spans over a century. The plant's story began in the 16th century with the use of Ketton stone, a Jurassic oolitic limestone, as a building stone.
Related reading: Seed Money the Chuck Holmes Story
Ketton Cement works has its roots in the early 20th century, specifically in 1921, when Frank Walker, a Sheffield builder, bought 1174 acres of Ketton parish, most of which consisted of old quarries and clay pits. He established a small concrete block factory company under the name "Walkers Ketton Stone Company" in 1925.
The first full weekly wage-bill of £202.2.11 was paid on the week ending 10 August 1928 for about 90 men, showing the plant's rapid growth. By the week ending 8 November, the wage bill had risen to over £600 for around 250 men and boys.
The plant's expansion continued in the 1930s with the addition of Kiln Two in 1933 and Kiln Three in 1939, which was notable for its new reinforced concrete chimney standing at an impressive 338 feet high.
Additional reading: Draftkings Week 6 Sleepers
Hanson Acquisitions
In 1999, Scancem was bought by Heidelberg Cement, which led to changes in the Castle Cement logo to incorporate the new parent company's name.
Heidelberg Cement continued to expand its reach in 2007 when it acquired Hanson Plc, formally known as ARC. Two years later, Castle Cement merged with Civil & Marine to form Hanson Cement.
The Castle "Turret" logo was retained on packaging due to strong customer loyalty. The distinctive Castle logo was replaced by the Hanson "H" logo.
Ketton Cement Works is now one of the most efficient plants in Europe, having been in operation for almost 100 years.
Broaden your view: Ohio E Check Years
Raw Materials and Mills
The raw materials and mills at Ketton Cement Works played a crucial role in producing cement. The initial rawmill, an FLS Unidan mill, had a diameter of 12 m and was fed with crushed limestone, clay slurry, and water to create a slurry with around 35% moisture.
The rawmill was powered by an AEI 1500 HP motor, which drove it at 18.8 rpm via a Symetro gearbox. The slurry was then pumped to a set of small blending tanks and transferred to a new Edgar Allen kiln feed storage basin.
A coal-fired Edgar Allen rotary dryer was used to remove most of the moisture from the low-grade East Midlands coal, which was then ground in an FLS Tirax mill. The mill was swept with hot air from the kiln hot end shield.
The initial plant had a washmill for clay, which was later replaced by a crusher/drier for kiln 7. For kiln 8, a Polysius RM46/23/85 roller mill was used.
Take a look at this: Retained Cash Flow / Net Debt
Rawmills
The rawmills in the cement plant were a crucial part of the production process, responsible for grinding raw materials into a fine powder.
The initial plant had a washmill for clay, which produced a clay slurry that was then inter-ground with limestone and sand in an FLS 485 kW ball mill.
Similar ball mills were added at the installation of kilns 2, 3, and 4, and a second clay washmill was installed in 1939.
Further ball mills were added with kilns 5 and 6, with a size of 12.0 × 2.9 meters and 102 tons of media, powered by a 1119 kW motor.
You might like: Market Value Added
Two clay washmills were installed at the quarry to increase production capacity.
For kiln 7, clay was prepared by an oil-fired (later coal-fired) crusher/drier, which was later replaced by a vertical mill.
For kiln 8, a Polysius RM46/23/85 roller mill was used, with a table diameter of 4.6 meters.
Here's a list of the different types of rawmills used in the plant:
- FLS 485 kW ball mill (initial plant)
- 12.0 × 2.9 meters ball mill (kilns 5 and 6)
- Polysius RM46/23/85 roller mill (kiln 8)
Coal Mill
The coal mill was designed to handle low-grade East Midlands coal with high moisture content, up to 22%. This coal was processed to remove excess moisture.
Most moisture was removed by a coal-fired Edgar Allen rotary dryer, which measured 46 feet long and 7 feet 6 inches in diameter. The product was then fed into the coal mill.
The FLS Tirax mill used in the coal mill process had a diameter of 2.2 meters and included a drying chamber 2 meters long and a grinding chamber 3.2 meters long.
If this caught your attention, see: Chamber of Digital Commerce
Kilns and Cement Production
The kilns at Ketton Cement Works played a crucial role in the production of cement. The first kiln, Kiln A1, was operated from 1933 to 1986 and was identical in all other respects to Kiln A2 and Kiln A3.
Kiln A1, Kiln A2, and Kiln A3 were all designed by FLS and had a standard FLS design, with the initial 60,000 tpa plant being a long process of development that ultimately became one of Britain's largest plants.
The kilns were located at the hot end and cold end of the plant, with specific coordinates for each kiln. For example, Kiln A2 was located at the hot end (cooler ports) 498564,305506 and the cold end 498490,305482.
Here is a summary of the typical output and heat consumption for each kiln:
The kilns were progressively uprated with more-or-less identical kilns, with the fourth kiln being added in 1954.
Kiln A8
Kiln A8 was part of a larger cement plant that was developed over time to become one of Britain's largest plants. The initial 60,000 tpa plant was implemented with a standard FLS design.
The mechanical plant was ordered by Parry & Elmquist, agents for FLS, and the onward technical management of the company was supervised by FLS and Tunnel. This partnership was key to the plant's success.
The plant's history closely parallels that of Hope, another FLS project that started up a few months later. Many interesting comparisons can be made between the two.
Kiln A8 was one of several kilns at the plant, with the fourth kiln being added in 1954. The kilns were progressively uprated over time.
Here's a list of the kilns at the plant, including their typical output and heat consumption:
Note: The typical output and heat consumption values are based on the relevant article sections and may not reflect the actual performance of the kilns.
Portland Cement Plant
The Portland Cement Plant is a crucial part of the cement production process. It's where the raw materials, like limestone, clay, and sand, are mixed and ground into a fine powder called cement clinker.
The raw materials are heated to high temperatures in a kiln, which is typically fueled by coal or natural gas, to produce the clinker. This process is called calcination and it's a critical step in cement production.
The clinker is then cooled and ground into a fine powder, which is the final product of the Portland Cement Plant. This powder is what we commonly refer to as Portland cement.
The cement is then mixed with other ingredients, like gypsum, to produce the final cement product. The exact mix of ingredients can vary depending on the specific type of cement being produced.
A unique perspective: Final Quality Audit
Plant Extensions and Upgrades
In the 1960s, the plant at Ketton Cement Works needed an extension to keep pace with the industry's general expansion during that period.
The last kiln added, kiln 4 in 1954, had been crammed into a tight space, making further expansion within the existing plant layout impossible.
A new integrated plant was constructed on open ground to the north, effectively doubling the plant's capacity.
This development was publicised in several journals and magazines, highlighting the company's commitment to growth and innovation.
Cement Plant Facilities
The cement plant facilities at Ketton Cement Works were quite impressive. Three 1500 T silos were built in addition to the existing facilities.
The plant's storage capacity was significantly increased with the installation of these new silos.
In 1967, three more 3000 T silos were added to further boost the plant's storage capabilities.
Consider reading: Are Assisted Living Facilities a Good Investment
Environmental and Community Impact
Ketton Cement Works has taken significant steps to reduce its environmental impact. In the 1990s, Castle Cement introduced Profuel, a recycled fuel product made from shredded paper and plastics, to reduce coal burning.
The introduction of Profuel was a major success, and in 1996, used car tyres were also introduced as an alternative fuel. This shift towards more sustainable energy sources has made a significant difference.
A solar power farm was built on land reclaimed from a 1940s quarry in 2013, providing 13% of the cement works' annual energy consumption. This innovative approach to renewable energy has helped reduce the plant's carbon footprint.
Discover more: Amazon Pay Fuel Offer
Ketton Cement Works is also prioritizing biodiversity, with 30,000 bees now calling the land surrounding the plant home. This initiative was made possible by a company tanker driver and amateur beekeeper who donated three hives to support the local ecosystem.
The bees have a range of around three miles, pollinating flowers and plants not just around the hives but also in the nearby farmers' fields. This is a great example of how the plant is working to support the local environment.
Here's an interesting read: Management by Wandering around
Exhaust
The exhaust system at Ketton was a significant upgrade following the Clean Air Act in 1956. A 225 HP induced draught fan was installed to direct kiln exhaust to electrostatic precipitators.
These electrostatic precipitators were designed for 100,000 cfm at 185°C, with two fields in series to maximize dust collection. The first dust control installations at Ketton used these precipitators.
The precipitators discharged into a 300 ft reinforced concrete stack with a 15 ft diameter discharge. The dust collected was returned to the kiln below the chain system.
Quarry Expansion Faces Opposition
Hundreds of people have signed a petition opposing the expansion of a quarry at Ketton, UK. The petition was handed over to Gale Waller, leader of Liberal Democrat Rutland County Council.
The expansion plans involve two new areas, Field 14 and Northwest Land, which are already owned by Hanson. These areas have been identified as suitable extensions to the Grange Top quarry, adjacent to Ketton cement works.
The opposition to the expansion is largely due to concerns about air quality, lighting, noise, and an increase in dust. Residents in Empingham argue that the expansion will have a negative impact beyond Ketton.
The expansion plans are currently being considered by Rutland County Council.
Environment
Ketton cement works has made significant efforts to reduce its environmental impact over the years. In the 1990s, Castle Cement introduced Profuel, a recycled fuel product made from shredded paper and plastics, to reduce coal burning.
The introduction of burning waste as a fuel was initially met with concerns from local communities, but the company worked hard to communicate with its neighbors and address their worries. This included local meetings, visits, and newsletters.
A unique perspective: Fuel Hedging
In 2013, Lark Energy built a solar power farm on reclaimed land, which now provides 13% of the cement works' annual energy consumption. This is a significant step towards reducing the site's reliance on fossil fuels.
The company has also taken steps to reduce dust pollution, with electrostatic dust arrestment equipment fitted to Kiln 5 in 1962. Similar equipment was installed for Kiln 6, using the same stack.
Here's a brief overview of the environmental initiatives at Ketton cement works:
- Profuel: a recycled fuel product made from shredded paper and plastics
- Solar power farm: provides 13% of the cement works' annual energy consumption
- Electrostatic dust arrestment equipment: fitted to Kiln 5 in 1962 and Kiln 6
These efforts demonstrate a commitment to reducing the environmental impact of the cement works and improving the local community's quality of life.
Featured Images: pexels.com