Coal Power Generation Company Bangladesh Limited is a state-owned company responsible for generating electricity through coal power. Its primary goal is to increase the country's power generation capacity.
The company was established in 2015 to implement the country's first coal-fired power plant project. This project aimed to increase the country's power generation capacity.
The company's main objective is to provide reliable and efficient electricity to the country's growing population and industries. This is crucial for the country's economic growth and development.
The company's first coal-fired power plant, located in Payra, is a 1,320 MW plant that has been operational since 2018.
For more insights, see: Xishan Coal and Electricity Power
Project Details
Coal Power Generation Company Bangladesh Limited is a state-owned enterprise responsible for the operation and management of the country's coal-fired power plants. The company was established in 1997.
The company's primary objective is to ensure reliable and efficient power generation to meet the increasing demand of the country.
Coal Power Generation Company Bangladesh Limited operates a total of 4 power plants, which are located in different parts of the country.
These power plants have a combined installed capacity of 1,320 MW, which is a significant contribution to the country's overall power generation capacity.
The company's power plants are equipped with state-of-the-art technology to minimize environmental impact and ensure safe operation.
Construction and Operations
The Matarbari 1200 MW Coal Power Plant, also known as Matarbari USC Thermal Power Station, is an Ultra-supercritical thermal power plant situated in Cox’s Bazar District of Bangladesh.
It is sponsored by Coal Power Generation Company Bangladesh Limited (CPGCBL), a subsidiary of Bangladesh Power Development Board (BPDB), as a publicly owned Independent Power Producer (IPP) for 25 years.
Construction of the power plant is currently underway, with a Commercial Operation Date (COD) of 26 July 2024 for both the 1st and 2nd units.
The retirement date for the power plant is July 2049.
Related reading: Lyudinovsky Locomotive Plant
Power Generation
The Coal Power Generation Company Bangladesh Limited is a significant player in the country's energy sector. Its power generation capacity is impressive, accounting for 10% of the total generation capacity of Bangladesh.
The plant is expected to produce a substantial amount of electricity, with a power generation capacity of 1.2 GW.
Company Information
Coal Power Generation Company Bangladesh Limited is a company with a significant presence in the country's energy sector. The company is the owner of Unit 1 and Unit 2, as shown in Table 3: Unit-level ownership and operator details.
The company's ownership structure is straightforward, with Coal Power Generation Company Bangladesh Ltd holding 100% ownership of both Unit 1 and Unit 2 at both timepoints 1 and 2. This suggests a high degree of control and decision-making power within the company.
The company's fuel conversion plans have been cancelled for both Unit 1 and Unit 2, as stated in the unit-level fuel conversion details. This means that the planned conversions from coal to fossil gas will not be implemented.
Take a look at this: SpareBank 1 Nøtterøy–Tønsberg
Job
Coal Power Generation Company Bangladesh Limited (CPGCBL) is looking for talented professionals to join their team. They have invited applications for various positions, including Executive Director (Project), Chief Engineer, and Assistant Manager (HR).
The required qualifications for these positions are quite specific. Candidates should have a BSc in Electrical, Electrical and Electronic, Electromechanical, Mechanical, or Civil Engineering, or a Graduation degree with a 1-year Master's degree in HR/Management.
Applicants must have at least 4-20 years of working experience in the power sector or executive engineering under a large public utility organization or company. This experience is crucial for the job.
Recommended read: Thorn Electrical Industries

The application process is straightforward. Interested candidates can collect and fill out the application form from the CPGCBL official website, www.cpgcbl.gov.bd.
The application form will be available from August 1 to September 1, 2019. Candidates must submit their application along with photocopies of all educational certificates, experience certificates, and other required documents.
The application must be reached to the Manager (HRM), Coal Power Generation Company Bangladesh Limited, at Unique Heights (Level-17), 117 Kazi Nazrul Islam Avenue, Dhaka-1217, before September 1, 2019.
For another approach, see: SpareBank 1 Nord-Norge
Table 3: Ownership and Operator Details
Coal Power Generation Company Bangladesh Ltd is the sole owner of Units 1 and 2. This company has a 100% stake in both units, as seen in Table 3.
The parent company for both Units 1 and 2 is also Coal Power Generation Company Bangladesh Ltd, with a 100% stake.
The ownership structure remains the same for Units 1 and 2 across different timepoints, as shown in Table 3.
Related reading: Round 2 (company)

Here is a summary of the ownership details:
Featured Images: pexels.com