Zakhidenergo is a Ukrainian energy distribution company that plays a crucial role in the country's energy landscape. It operates in the western region of Ukraine, serving over 2 million customers.
The company's main task is to ensure a stable and reliable supply of electricity to its customers. This is achieved through a network of power lines, substations, and other infrastructure.
Zakhidenergo's impact on the local economy is significant, with the company generating substantial revenue from electricity sales. This revenue is then invested in the maintenance and expansion of the energy infrastructure.
The company's operations have a direct impact on the daily lives of its customers, with any disruptions to the energy supply potentially causing significant inconvenience.
Readers also liked: FedEx Supply Chain
History of Zakhidenergo
Zakhidenergo has a rich history that spans several decades. The company was formed in 1995, on the basis of thermal power plants BEO "Lvivenergo" – Burshtyn and Dobrotvirska TES, as well as Ladyzhyn TES.
The construction of Dobrotvirska TES began in 1951 and continued until 1959, with the installation of power units with capacities of 25 MW, 50 MW, 100 MW, and two 150 MW units. This marked the beginning of large-scale development of electric power in Western Ukraine.
The main direction of development for Zakhidenergo was to increase the unit capacity and improve the efficiency of equipment. To achieve this, the company focused on modernizing its power plants.
In 1962-1969, Burshtyn TES was put into operation, with 200 MW power units. This was followed by the construction of the Rivne NPP, the first nuclear power plant in the former USSR, which was introduced in December 1979.
Here are the connections of the Burshtyn TPP:
In 1996, the Burshtyn TPP was renamed from Burshtyn GRES, and in 2011, Zakhidenergo Open Joint-Stock Company was renamed Zakhidenergo Public Joint-Stock Company.
You might enjoy: Joint Stock Companies Act 1856
Project Overview
Zakhidenergo's reconstruction project was a massive undertaking that took only 10 months to complete. The project involved the reconstruction of electrical equipment of power unit No. 5 of DTEK Burshtyn CHP.
The scope of work was extensive, with over 10 different tasks performed, including the repair of synchronous electrical motors, replacement of high-voltage and low-voltage electric motors, and reconstruction of the integrated cable system. The project also involved the replacement of outdated equipment with modern ones, such as vacuum switches and current transformers.
Here are some of the key tasks performed during the project:
- Repair of synchronous electrical motors of ball tube mills (КВМ type)
- Replacement of high-voltage and low-voltage electric motors of main and auxiliary technological equipment
- Reconstruction of the integrated cable system and the lighting system of the power unit
- Replacement of air circuit breakers, current transformers, busbar supports, and installation of excess-voltage suppressors at the transformer annex
About Project
The project was commissioned by "Zakhidenergo" OJSC and had a 10-month deadline. The reconstruction of electrical equipment of power unit No. 5 of DTEK Burshtyn CHP was a complex task that required careful planning and execution.
The project involved the reconstruction of electrical equipment, including the repair of synchronous electrical motors of ball tube mills, replacement of high-voltage and low-voltage electric motors, and reconstruction of the integrated cable system and lighting system of the power unit.
A total of 12 tasks were performed during the project, including the reconstruction of control and distribution unit КRP - 6 kV, implementation of microprocessor protection system of "Generator – Transformer" unit, and overhaul of the auxiliary transformer TRDN 25000/35A.
Take a look at this: Turner Broadcasting System

Here are the specific tasks that were performed:
- Repair of synchronous electrical motors of ball tube mills (КВМ type)
- Replacement of high-voltage and low-voltage electric motors
- Reconstruction of the integrated cable system and lighting system of the power unit
- Reconstruction of control and distribution unit КRP - 6 kV
- Implementation of microprocessor protection system of "Generator – Transformer" unit
- Overhaul of the auxiliary transformer TRDN 25000/35A
- Reconstruction of Outdoor Switchgear VRP-220 kV
- Reconstruction of stator and rotor of turbogenerator TGV-200
- Replacement of excitation systems with UNITROL 6800 modern thyristor system
- Overhaul of synchronous electrical motors of ball tube mills (КБМ)
- Replacement of air circuit breakers, current transformers, busbar supports, and installation of excess-voltage suppressors
- Replacement of disconnectors and current transformers
The project was completed on time, and the customer was satisfied with the results.
Project Locations
The Dobrotvir power station is located in Staryi Dobrotvir, Kamianka-Buzka, Lviv, Ukraine.
The project's location is specific, with coordinates (WGS 84) of 50.214293, 24.374654 for the main plant.
You can find the power station on a map using these coordinates, which pinpoint its exact location.
The project has multiple units, each with its own coordinates.
Ownership and Operations
Zakhidenergo is a Ukrainian electricity distribution company that operates in the western part of the country.
The company was established in 1998 and has been providing electricity distribution services to over 2.5 million customers in 12 regions.
Zakhidenergo's network consists of over 150 substations and 35,000 kilometers of power lines.
The company's main goal is to ensure reliable and efficient electricity supply to its customers.
Zakhidenergo's operations are regulated by the National Energy Regulatory Commission of Ukraine.
Discover more: Enel Distribution São Paulo

The company is required to invest a significant portion of its revenue in grid modernization and infrastructure development.
Zakhidenergo's revenue is generated primarily through the sale of electricity to its customers.
The company's financial performance is influenced by the overall economic situation in Ukraine.
Zakhidenergo has a strong focus on customer service and has implemented various initiatives to improve customer satisfaction.
Environmental Impact
The Dobrotvir power station, operated by Zakhidenergo, has a significant environmental impact in Lviv Oblast. In 2020, it was named the top polluting enterprise in the region.
The power station has a history of releasing heated water into the Western Bug River, causing mass die-offs of fish in both 2020 and 2021. This has a devastating effect on the local ecosystem.
Flue gas stacks from the power station are a major contributor to air pollution in the area. The types of flue gas stacks include coal-fired, natural gas-fired, oil-fired, and those built in the Soviet Union.
The power station's environmental impact is not limited to air pollution. Leaking toxic chemicals into the Western Bug River has also been a significant issue.
Worth a look: Monongahela River Consolidated Coal and Coke Company
Ukraine and Zakhidenergo

In 3Q11, Centrenergo and Zakhidenergo reported strong financial results, with Centrenergo's revenues up 33% y-o-y to USD 251.6 mln.
Zakhidenergo's revenue growth of 57% was the highest in the sector, driven by its highest electricity output growth.
The company's EBITDA margin of 8% was down 2 pp y-o-y, but its strong revenue growth was a positive sign for the sector.
Zakhidenergo's financials were impressive, with a revenue growth of 57% y-o-y to USD 242.6 mln in 3Q11.
Additional reading: Centrenergo
Centrenergo Posts Strong 3Q11 Results
Centrenergo posted strong 3Q11 results, with revenues up 33% year-over-year to USD 251.6 million.
Its EBITDA margin increased to 20%, a 14 percentage point improvement from the same period last year.
A one-off tax benefit of USD 18 million contributed to Centrenergo's spike in EBITDA margin to 20% in 3Q11, which is 7% of 3Q11 sales.
The growth in coal prices, a key cost component, was limited to only one month of operations in 3Q11, as it increased by approximately 7% in September.
As a result, Centrenergo's strong profitability figures in 3Q11 have led to an increase in forecasts of GenCos EBITDA margins in 2011E by 1.5x-2x.
Related reading: Cassa Centrale Banca - Credito Cooperativo Italiano
War in Ukraine
The war in Ukraine has taken a significant toll on the country's infrastructure, including the power plants managed by Zakhidenergo. In February 2023, the residents of Dobrotvir were left without electricity and heat due to damage to a critical infrastructure object.
Damage to the 150MW unit at the plant, known as Unit 7, was reported as of November 2023, with critical damage sustained. The plant was under attack by Russian missiles in May 2024, but it appeared to be operating in some capacity by June 2024.
However, another source from August 2024 suggested that the plant would no longer be able to generate electricity. It's unclear which specific plants have been restored and to what extent, especially with ongoing attacks.
For your interest: Saudi Electricity Company