Kuzbassenergo is a leading energy company in the Kuzbass region, with a total installed capacity of over 3 GW.
The company's power generation is primarily based on coal-fired power plants, with a focus on using local coal resources.
Kuzbassenergo has a strong commitment to modernization and upgrading its existing infrastructure to increase efficiency and reduce emissions.
The company has implemented various modernization projects, including the upgrade of its power transmission and distribution systems, and the installation of more efficient turbines.
Operations
Kuzbassenergo's operations are centered in the Kuzbass region of Russia, where the company generates a significant portion of the country's electricity.
The company operates a network of power plants, including thermal, hydro, and gas-fired facilities, which provide a reliable and efficient supply of electricity to the region's consumers.
Kuzbassenergo's transmission and distribution system is designed to ensure the safe and reliable delivery of electricity to over 1.5 million households and businesses in the region.
Related reading: Western Electricity Supply Company of Odisha
Budgeting System Implementation at Yenisei TGC (2010)

In 2010, Kuzbassenergo and Yenisei TGC implemented a budgeting system using the SAP BI IP module.
The system created a single information space for planning and analyzing plan and actual data. This allowed for more accurate forecasting and decision-making.
The budgeting system increased the planning horizon to 3 years, enabling the companies to make more informed long-term decisions.
An 18-month rolling forecast was also implemented, allowing for regular updates and adjustments to the budget.
This approach helped the companies to better manage their resources and achieve their goals.
For another approach, see: Centegra Health System
Modernization
The Reftinskaya power plant is undergoing modernization as part of the COMMod program, where it will receive capacity payments for 15 years.
In July 2024 and 2025, Unit 1 and Unit 4 will start their respective projects, with SGK mainly replacing turbines and generators.
SGK plans to invest RUR 9 billion toward modernization at the station, with the modernization of Unit 1 expected to be completed by 2026 and Unit 4 by 2027.
The capacity of each unit will increase from 300MW to 315MW, a significant boost to the power plant's overall output.
However, the modernization process has not been without its challenges, including the substitution of imported components and increase in the cost of materials.
As of June 2022, planning was ongoing for Unit 1, with a technical project being developed for the new turbine and generator.
An overhaul of Unit 4 was completed in June 2022, which included refurbishing the old turbine and boiler without replacement.
The plant had to prepare for COMMod by implementing repairs prior to the start of the program, as not all equipment was covered by the program.
The modernization program was delayed due to the failure to meet equipment delivery deadlines, with works on Unit 1 expected to start in 2025 and works on Unit 4 in 2026.
Coal Source
Reftinskaya GRES power station has been successfully running on a mixture of coal types, including Kuzbass coal and Ekibastuz coal, since a pilot combustion was completed in July 2021.
The plant was still using coal from Bogatyr coal mine, amounting to about 10 million tonnes per year, as of April 2023.
The plant has also confirmed its capability to use Russian coal from Kiyzassky coal mine and Zarechny coal mine in Kuzbass basin, a review of which was ongoing as of 2023.
A decision on switching to coal from Khakassiya was expected to be taken in 2024, according to a source.
The plant continued to burn coal from Ekibastuz, supplying 10.4 million tonnes of coal per year, as of April 2025, with a contract end in 2027.
The company was still searching for an equivalent replacement of Russian coal.
Expand your knowledge: Per Aarsleff
Management
Kuzbassenergo has a diverse management team, with Andrey Nikolayevich Bolshakov serving as the Chairman of the Board, a position he has held since 2012.
The Board of Directors is comprised of six members, including Irina Vladimirovna Butakova, who has been a Director since 2011. She is joined by Alla Yevgenyevna Zhdan, who has been on the Board since 2014, and Viktor Mikhaylovich Papko, also a Director since 2014.

Dmitriy Viktorovich Skorokhodov, who is 48 years old, has been a Director since 2015. Tatyana Borisovna Pikhtovnikova, 54 years old, and Pavel Sergeyevich Spiridonov, 61 years old, are also Directors, although the exact dates of their appointments are not specified.
The management team also includes Natalya Leonidovna Shchegolevatykh, 51 years old, and Aleksey Vladimirovich Nefedov, 51 years old, both of whom are Directors. Anton Nikolayevich Shilin, 39 years old, is the youngest member of the Board.
Here is a list of the Board of Directors:
Contact and Details
Kuzbassenergo has its headquarters located in Kemerovo, Russia.
You can contact Kuzbassenergo by phone at +7 (384-2) 77-11-11 or by email at [[email protected]](mailto:[email protected]).
Their official website is kuzbassenergo.ru, where you can find more information about the company and its services.
Project Information
Kuzbassenergo operates multiple power plants, each with its own unique characteristics. The company's power plants are a mix of old and new, with some units dating back to the 1970s.
See what others are reading: Concern Tractor Plants
The oldest units, such as Unit 1 and Unit 4, were built in 1970 and 1972, respectively, and have a capacity of 300 MW. These units are still operational today, despite being over 50 years old.
Some units have been planned for retirement, including Unit 2, Unit 3, and Unit 5, which are all scheduled to be retired by 2031.
Kuzbassenergo
Kuzbassenergo is a Russian joint-stock company that specializes in the distribution of energy. It was founded in 1943 and is headquartered in Kemerovo, Russia.
The company's revenue in 2010 was a significant RUB30,617 million. Its operating income for the same year was RUB3,493 million.
Kuzbassenergo's CEO is Sergey Mikhailov, who has been leading the company. The company is controlled by Siberian Energy Investments Ltd., a holding company.
In 2010, Kuzbassenergo generated 24.906 GWh of electricity. This is a notable achievement for the company.
Here are some key statistics about Kuzbassenergo's financial performance in 2010:
Kuzbassenergo's total assets in 2010 were RUB33,768 million. The company has a significant presence in Russia's energy sector.
Project Details

The project is located in an area with a coal source, specifically Ekibastuz coal. This coal is used as the primary fuel source for the power generation units.
The project has a total of 9 units, all of which are currently operating. This is a significant factor in the project's overall capacity and efficiency.
Here's a breakdown of the units:
All units, except Unit 11, use supercritical technology, which is a highly efficient method of power generation.
Ownership and Change
Kuzbassenergo has a straightforward ownership structure, with all of its units being owned by Kuzbassenergo JSC, a company that holds 100% of the shares for each unit.
The company's ownership has remained consistent across its units, with the exception of a change in ownership for the Reftinskaya GRES plant. This change occurred in 2019, when Enel sold the plant to Kuzbassenergo JSC, part of Siberian Generation Company, for 16.7 billion roubles.
Ownership Change

The ownership of Reftinskaya GRES changed hands in 2019, marking a significant shift in the plant's management. The plant was previously owned by OGK-5, which was majority-owned by Italian energy company Enel.
Enel had been evaluating the sale of the plant since April 2016, due to the end of subsidies and the Russian economy's weakness. The sale was completed in November 2019, with Kuzbassenergo JSC, part of Siberian Generation Company, acquiring the plant for 16.7 billion roubles.
Enel Russia and Kuzbassenergo JSC jointly managed the power plant under a lease agreement during a 9-month transition period. This period began on October 1, 2019, and ended on June 30, 2020.
The sale marked the departure of Russia's biggest foreign-owned utility company from the Russian coal power market.
Take a look at this: Jsc Tbc Bank
Table 3: Ownership and Operator Details
Let's take a closer look at the ownership and operator details of the project. The data shows that all units, from Unit 1 to Unit 9, are owned by Kuzbassenergo JSC, with a 100% stake in each.

The parent company for each unit is unknown, which suggests that there may be a complex organizational structure in place.
Kuzbassenergo JSC is the sole owner of all units, with no other stakeholders involved.
Here's a breakdown of the unit-level ownership and operator details:
The coal source for the project is Ekibastuz coal, which is a significant fact to note in understanding the project's operations.